Crowley Company, Inc. 10630 Nassau Street Northeast Minneapolis, Minnesota 55449 Telephone: 763-784-1120 Fax: 763-784-6043 www.crowleyco.com email: info@crowleyco.com |
![]()
| home
| profile | projects
| services |
products | contact |
| Project |
Contract
Amount |
Type of Work Performed |
| 2007 Work in Progress: | ||
State of Maryland
|
1,961,841.35 |
Furnish and install double perimeter security fencing |
US
Army Corps of Engineers Lock and
Dam Security Systems |
$1,778,388.57 |
Electronic Entry Control Systems include proximity-card/keypad entry control with balanced magnetic switch intrusion detection (IDS) on select Central Control Station (CCS) exterior end interior doors and downstream control stand (DCS) doors, DCS control panel lockouts, and modifications to the existing access control system at the perimeter gates, at each dam site. Includes all necessary conduit, wiring and fiver optics. Contractor's staff working on sites must pass both local and national background checks. |
Southeast Missouri Mental Health Center, Farmington, MO Modification
to Fencing |
$219,000 |
Modification to perimeter fence |
| 2006
Work Completed: |
|
|
| Perimeter Security Improvements |
$1,745,000.00 |
Furnish and Install First Defense with High Security
Mesh, stone treatment, demolish existing fence, electrical conduit and
wiring, taut wire outrigger and central control |
|
|
$2,295,000.00 |
|
State of Minnesota, MN Dept. of Human Services
|
$367,000 | Security upgrades to perimeter fence & modification to roof & fence, Prime contractor Morcon |
State of Minnesota, Dept. of Corrections, Fairbault, MN
|
$313,000 |
Construct
new Sally port Tymetal gates and operator |
State Correctional Institution Mercer, Findley Township, PA
|
$1,660,000.00 |
Replace Double Perimeter Fence at operating institution, high security mesh fence, barb tape, Overhead Slide Gates with crash beam, remove old fence |
Duluth air National Guard, Duluth, MN
|
$98,000 | Security
upgrade to(WSA)-Weapons storage area-vertical pivot gate & fence |
|
|
|
Woven wire fence-28,000 LF, Cantilever motorized gates, architectural fence and gates-2000 LF |
| |
|
|
|
|
$319,000 |
Ornamental Fence & Decorative Brick Pillars |
| |
|
|
|
|
|
Replace
two PLUSS Gates & Operator |
| |
|
|
State
of Minnesota St. Peter Regional Treatment Center, St. Peter, MN
|
$494,000 |
Perimeter Fence & Barb Tape |
Anoka County Airport, Metropolitan Airport Commission, Blaine, MN
|
$111,000 |
Perimeter
Security Upgrade 6000 L.F. of 10’ fence & gates Prime contractor NW Asphalt |
| 2005
Work Completed |
|
|
|
|
|
Conduit, Wiring, CCTV, DVR’s, Intercom, Door Locking, Perimeter Taut
Wire Intrusion with Head End Equipment |
State Correctional Institution Camp Hill, Department of General Services |
$1,900,000.00 |
Replace Double Perimeter Fence at operating institution,
high security mesh fence, barb tape, Overhead Slide Gates with crash beam,
hollow metal doors in existing building |
Southeastern Correctional Institution Perimeter Security Upgrade |
$1,610,000.00 |
Demolishing of existing of existing buildings and
existing fence; Replace Double Perimeter Fence and barb tape at operating
institution; Electrical Perimeter Security Upgrade, including conduit and
wiring, Fence Micronet Shaker System, fiber optics, CCTV and central control |
Forrester Construction Company, Inc
|
$1,350,000.00 |
Furnish and Install Active Barriers, Crash Beams,
Crash Gates, Ornamental Passive Barrier, Ornamental Fence, Permanent Bollards,
Retractable Bollards, Turnstiles, Chain Link, Fence, Crash Resistant Cable
Barrier, electrical controls and control panels |
| |
|
|
| 2004
Work Completed: |
|
|
| ASPC - Florence-Central Unit State of |
$1,208,000.00 |
Furnish and Install Stun Lethal Fence CCTV with
Fiber Optics; complete PLC system controls, HM Doors, Generator, miscellaneous
Chain Link fence work |
| |
|
|
| State Correctional Institution Luzerne Cty, Department of General Services |
$1,379,000.00 |
Electrical Perimeter Security, including PPI Fence
Shaker System, Microwave, fiber optics and CCTV |
| |
|
|
| JE Dunn Construction Company |
$1,500,000.00 |
Electrified Lethal Fence, Necessary PLC Controls
&, Software, Concrete Grade Beams, Specialize Gates, All Related,
Electrical Work |
| |
|
|
| 2003
Work Completed: |
|
|
| Marsellis-Warner Corporation |
$550,000.00 |
Security Fencing and Overhead Slide Gates, Electrically
Operated |
| |
|
|
| Max Gray Construction, Inc. |
$138,482.00 |
Remove and Install Chain Link Fence, Crash Resistant
Cable Barrier |
| |
|
|
| WSB & Associates |
$224,719.97 |
Perimeter Fence |
| |
|
|
| 2002
Work Completed: |
|
|
| KBA Durrant |
$391,600.00 |
Remote Locking, Doors and Frames, CCTV and Key Switch Locks |
| |
|
|
| Collins Correctional Facility OGS Design & Construction-Div. Of Const. |
$349,500.00 |
Upgrade Pedestrian Gate and Gate Consoles, Electrical
upgrade |
| |
|
|
| KBA Durrant |
$344,000.00 |
Security Fencing, |
| |
|
|
| J. Mark Rogers Architect |
$430,000.00 |
Security Fencing, First Defence System, Overhead
Slide Gates |
| |
|
|
| Architectural & Engineering Services |
NA |
NON LETHAL FENCE, complete operational and functional,
test in real time environment for proprietary, electric stun fence. Installed summer of 2000, running successfully
since |
| |
|
|
| Shawangunk Correctional Facility O.G.S. Design & Construction - Division of Construction |
$330,000.00 |
Security Fencing, Sally Port Upgrade, Overhead Slide
Gates |
| |
|
|
| 2001
Work Completed: |
|
|
|
|
$328,000.00 |
Chain link fencing and gates, Electrically operated
gates, CCTV |
| |
|
|
| State Correctional Institution, Department of General Services - |
$268,000.00 |
New fence and gates, Electric Locks, Intercom, CCTV |
| |
|
|
| Infirmary & Mental Health Unit Frerichs Construction Company |
$49,605.00 |
Chain link fence, barb tape, and overhead slide
gate |
| |
|
|
| State of |
$38,900.00 |
New perimeter razor wire |
| |
|
|
| State of |
$219,000.00 |
Electrical, intercom, chain link, wrought iron,
electrical gates |
| |
|
|
| Ray Angelini, Inc. |
$495,000.00 |
Perimeter security fence, barb tape, electrical
gate operators |
| |
|
|
| Prairie du Chien Correctional Institution PTD, Inc. |
$39,000.00 |
Security Screens |
| |
|
|
| South East Correctional Center Consolidate Electrical Contractors & Engineers. |
$363,000.00 |
Provide Electrified Lethal Fence Electrifiers, Control Panels and Wire Array Equ |