Crowley Company, Inc. 10630 Nassau Street Northeast Minneapolis, Minnesota 55449 Telephone: 763-784-1120 Fax: 763-784-6043 www.crowleyco.com email: info@crowleyco.com |
![]()
| home
| profile | projects
| services |
products | contact |
| Project |
Contract
Amount |
Type of Work Performed |
| 2007 Work in Progress: | ||
State of Maryland
|
1,961,841.35 |
Furnish and install double perimeter security fencing |
US
Army Corps of Engineers Lock and
Dam Security Systems |
$1,778,388.57 |
Electronic Entry Control Systems include proximity-card/keypad entry control with balanced magnetic switch intrusion detection (IDS) on select Central Control Station (CCS) exterior end interior doors and downstream control stand (DCS) doors, DCS control panel lockouts, and modifications to the existing access control system at the perimeter gates, at each dam site. Includes all necessary conduit, wiring and fiver optics. Contractor's staff working on sites must pass both local and national background checks. |
Southeast Missouri Mental Health Center, Farmington, MO Modification
to Fencing |
$219,000 |
Modification to perimeter fence |
| 2006
Work Completed: |
|
|
| Perimeter Security Improvements |
$1,745,000.00 |
Furnish and Install First Defense with High Security
Mesh, stone treatment, demolish existing fence, electrical conduit and
wiring, taut wire outrigger and central control |
|
|
$2,295,000.00 |
|
State of Minnesota, MN Dept. of Human Services
|
$367,000 | Security upgrades to perimeter fence & modification to roof & fence, Prime contractor Morcon |
State of Minnesota, Dept. of Corrections, Fairbault, MN
|
$313,000 |
Construct
new Sally port Tymetal gates and operator |
State Correctional Institution Mercer, Findley Township, PA
|
$1,660,000.00 |
Replace Double Perimeter Fence at operating institution, high security mesh fence, barb tape, Overhead Slide Gates with crash beam, remove old fence |
Duluth air National Guard, Duluth, MN
|
$98,000 | Security
upgrade to(WSA)-Weapons storage area-vertical pivot gate & fence |
|
|
|
Woven wire fence-28,000 LF, Cantilever motorized gates, architectural fence and gates-2000 LF |
| |
|
|
|
|
$319,000 |
Ornamental Fence & Decorative Brick Pillars |
| |
|
|
|
|
|
Replace
two PLUSS Gates & Operator |
| |
|
|
State
of Minnesota St. Peter Regional Treatment Center, St. Peter, MN
|
$494,000 |
Perimeter Fence & Barb Tape |
Anoka County Airport, Metropolitan Airport Commission, Blaine, MN
|
$111,000 |
Perimeter
Security Upgrade 6000 L.F. of 10’ fence & gates Prime contractor NW Asphalt |
| 2005
Work Completed |
|
|
|
|
|
Conduit, Wiring, CCTV, DVR’s, Intercom, Door Locking, Perimeter Taut
Wire Intrusion with Head End Equipment |
State Correctional Institution Camp Hill, Department of General Services |
$1,900,000.00 |
Replace Double Perimeter Fence at operating institution,
high security mesh fence, barb tape, Overhead Slide Gates with crash beam,
hollow metal doors in existing building |
Southeastern Correctional Institution Perimeter Security Upgrade |
$1,610,000.00 |
Demolishing of existing of existing buildings and
existing fence; Replace Double Perimeter Fence and barb tape at operating
institution; Electrical Perimeter Security Upgrade, including conduit and
wiring, Fence Micronet Shaker System, fiber optics, CCTV and central control |
Forrester Construction Company, Inc
|
$1,350,000.00 |
Furnish and Install Active Barriers, Crash Beams,
Crash Gates, Ornamental Passive Barrier, Ornamental Fence, Permanent Bollards,
Retractable Bollards, Turnstiles, Chain Link, Fence, Crash Resistant Cable
Barrier, electrical controls and control panels |
| |
|
|
| 2004
Work Completed: |
|
|
| ASPC - Florence-Central Unit State of |
$1,208,000.00 |
Furnish and Install Stun Lethal Fence CCTV with
Fiber Optics; complete PLC system controls, HM Doors, Generator, miscellaneous
Chain Link fence work |
| |
|
|
| State Correctional Institution Luzerne Cty, Department of General Services |
$1,379,000.00 |
Electrical Perimeter Security, including PPI Fence
Shaker System, Microwave, fiber optics and CCTV |
| |
|
|
| JE Dunn Construction Company |
$1,500,000.00 |
Electrified Lethal Fence, Necessary PLC Controls
&, Software, Concrete Grade Beams, Specialize Gates, All Related,
Electrical Work |
| |
|
|
| 2003
Work Completed: |
|
|
| Marsellis-Warner Corporation |
$550,000.00 |
Security Fencing and Overhead Slide Gates, Electrically
Operated |
| |
|
|
| Max Gray Construction, Inc. |
$138,482.00 |
Remove and Install Chain Link Fence, Crash Resistant
Cable Barrier |
| |
|
|
| WSB & Associates |
$224,719.97 |
Perimeter Fence |
| |
|
|
| 2002
Work Completed: |
|
|
| KBA Durrant |
$391,600.00 |
Remote Locking, Doors and Frames, CCTV and Key Switch Locks |
| |
|
|
| Collins Correctional Facility OGS Design & Construction-Div. Of Const. |
$349,500.00 |
Upgrade Pedestrian Gate and Gate Consoles, Electrical
upgrade |
| |
|
|
| KBA Durrant |
$344,000.00 |
Security Fencing, |
| |
|
|
| J. Mark Rogers Architect |
$430,000.00 |
Security Fencing, First Defence System, Overhead
Slide Gates |
| |
|
|
| Architectural & Engineering Services |
NA |
NON LETHAL FENCE, complete operational and functional,
test in real time environment for proprietary, electric stun fence. Installed summer of 2000, running successfully
since |
| |
|
|
| Shawangunk Correctional Facility O.G.S. Design & Construction - Division of Construction |
$330,000.00 |
Security Fencing, Sally Port Upgrade, Overhead Slide
Gates |
| |
|
|
| 2001
Work Completed: |
|
|
|
|
$328,000.00 |
Chain link fencing and gates, Electrically operated
gates, CCTV |
| |
|
|
| State Correctional Institution, Department of General Services - |
$268,000.00 |
New fence and gates, Electric Locks, Intercom, CCTV |
| |
|
|
| Infirmary & Mental Health Unit Frerichs Construction Company |
$49,605.00 |
Chain link fence, barb tape, and overhead slide
gate |
| |
|
|
| State of |
$38,900.00 |
New perimeter razor wire |
| |
|
|
| State of |
$219,000.00 |
Electrical, intercom, chain link, wrought iron,
electrical gates |
| |
|
|
| Ray Angelini, Inc. |
$495,000.00 |
Perimeter security fence, barb tape, electrical
gate operators |
| |
|
|
| Prairie du Chien Correctional Institution PTD, Inc. |
$39,000.00 |
Security Screens |
| |
|
|
| South East Correctional Center Consolidate Electrical Contractors & Engineers. |
$363,000.00 |
Provide Electrified Lethal Fence Electrifiers, Control
Panels and Wire Array Equipment and Supervision |
| |
|
|
|
|
$325,000.00 |
Provide Electrified Lethal Fence Electrifiers, Control
Panels and Electrified Fence Post and Wire Array Equipment and Supervision |
| |
|
|
| 2000
Completed Project Work: |
|
|
| Northeast Correctional Center, George Butler and Associates |
$2,740,000.00 |
Electrified Lethal Fence, Necessary Controls &
Software, Concrete Paving & Grade Beams Electrical and |
| |
|
|
| Six (6) Department of Management and Budget |
Bid Pack
#A - $377,000.00 Bid Pack
#B - $349,000.00 |
Perimeter Security Upgrades, Buried Chain Link Fabric,
Electrified Security |
| |
|
|
| Repairs & Upgrade of Secure Perimeter Fence
Mr. David Markunius |
$653,000.00 |
Barb Tape, Upgrade Barb Tape, New OH Slide, Electric Gates, Concrete Grade Beam, Operator,
Controls, SW Microwave Shaker and Electrical |
| |
|
|
| MN Correctional Facility- Stillwater Gate Repair
|
$253,000.00 |
New Sallyport, PLUSS Gate Systems, Concrete work,
Sewer and Water |
| |
|
|
| Red Wing Correctional Facility, Red Wing, MN Klein McCarthy & Co., Ltd. |
$1,066,000.00 |
First Defence, Site Work, Parking Lots, Gate Operators |
| |
|
|
| Provide Perimeter Fence System, State of |
$1,465,000.00 |
Security Fence, Gate Operators, Sallyports, Barbed
Tape, Electrical, Various Civil Work |
| |
|
|
| 1999
Completed Project Work: |
|
|
| Kraemer Brothers |
$815,000.00 |
Stun-Lethal Fence, Necessary Controls & Software,
Electrical, and Misc. Site Work |
| |
|
|
| South Central Correctional Center Licking, MO Guarantee Electrical |
$132,965.00 |
Install Electrified Fence Array, Provide and Install |
| |
|
|
| George Butler and Associates |
$3,519,000.00 |
Electrified Lethal Fence, necessary Controls &
Software, Concrete Paving & Grade Beams, Electrical and Misc., Site
Work & Fence Array |
| |
|
|
| 1998
Completed Project Work: |
|
|
| Replace Concertina Wire at Seven (7) Department of Management and Budget |
Bid Pack
#1 - $487,000.00 Bid Pack
#2 - $737,000.00 |
Replace Barb Tape |
| |
|
|
| Perimeter Fence and Bedwell Company |
$690,000.00 |
First Defence Arched Security Fence, Gate Operators,
Sallyports |
| |
|
|
| New Maximum Security Facility, Turner Construction Company |
$1,550,000.00 |
Perimeter Fence, High Security Mesh Specialized
Rec. Cages, Sallyport & Operators, Barb Tape |
| |
|
|
| Perimeter Fence System, Department
of Rehabilitation & Correction |
$1,420,000.00
|
Security Fence, Gate Operators, Sallyports, Barbed,
Tape, Electrical, FPS-3 Fence Protection, System, Microwave |
| |
|
|
| Prison for Drug Offenders, Brown & Root Building Company |
$858,000.00 |
Security Fence, Gate Operators, Sallyports, Barbed
Tape, Electrical, |
| |
|
|
| 1997
Completed Project Work: |
|
|
| State Correctional Institution, Department of General Services |
$719,000.00 |
Perimeter Fence, Barb Tape, Concrete Sidewalk and
Curb, Sallyports |
| |
|
|
|
|
$717,000.00 |
Security Fence, Gate Operators, Sallyports, Barbed Tape |
| |
|
|
| Western Correctional Facility, Chas. H. Tompkins Co. |
$2,601,000.00 |
Security Fence, Gate Operators, Sallyports, Barbed
Tape, Electrical |
| |
|
|
| Western Correctional Facility, Bell BCI Company |
$1,611,000.00 |
Security Fence, Gate Operators, Sallyports, Barbed
Tape, Electrical |
| |
|
|
| 1996
Completed Project Work: |
|
|
| MN Department of Corrections,
|
$158,000.00 |
Specialized Rec. Cages |
| |
|
|
| Cybulski Correctional Institution, Project No. BI-DC-76 Department of Corrections |
$248,000.00 |
Security Fence, Blacktop, Sallyports, Barbed Tape |
| |
|
|
| Willard Correctional Institution, Project No. BI-DC-77 Department of Corrections |
$244,000.00 |
Security Fence, Blacktop, Sallyports, Barbed Tape |
| |
|
|
| Project No. 30-931-95-0020(B)
|
$429,000.00 |
Security Fence, First Defence, Sallyports, Barbed
Tape, Operators |
| |
|
|
| 1995
Completed Project Work: |
|
|
| Barksdale Air Force Base WSA, Department of the Navy - ROICC |
$468,000.00 |
Remove & Replace Perimeter Fence, Roadwork |
| |
|
|
| Stahl Construction Company |
$553,890.00 |
Security Fence, Gate Operators, Sallyports, Barbed
Tape |
| |
|
|
| State of |
$777,000.00 |
Security Fence, Barb Tape, CCTV, FPS Electronic
Fence Protection System, 50’ Camera Poles |
| |
|
|
| 1994
Completed Project Work: |
|
|
| State of |
$213,000.00 |
Remove & Replace Barbed Tape |
| |
|
|
| Garner Correctional Institution,
|
$310,000.00 |
Security Fence, Gate Operators, Sallyports, Barbed
Tape, Roof Mounted Barbed Tape |
| |
|
|
|
|
$548,000.00 |
Security Fence, Gates |
| |
|
|
| Somers Correctional Institution, Sommers, CT Orlando, Annulli & Sons, Inc. |
$689,000.00 |
Security Fence, Gate Operators, Sallyports, Barbed
Tape, Taut Wire System |
| |
|
|
| Draper State Prison, Draper, UT State of |
$1,310,000.00 |
Electronic Security, Security Fencing |
| |
|
|
| Furnish
Only: |
|
|
| Chevron Overseas Petroleum |
$655,697.00 |
Furnish NonClimb3/8" Chainguard Anti-Terrorist
Mesh ® |
| |
|
|
| 1993
Completed Project Work: |
|
|
| State of |
$523,244.00 |
Perimeter Fence, Clearing, Seeding |
| |
|
|
| A.A. Ribicoff Courthouse Annex, General Services Administration |
$121,672.00 |
Wrought Iron Fence, Electric Operated Gates. |
| |
|
|
| Colorado State Penitentiary, East Canon City, CO CRSS |
$255,725.00 |
Security Fence, Barbed Tape, Electrically Operated
Gates |
| |
|
|
| Old Colony Correctional Center,
|
$157,500.00 |
Wall Mounted Security Fence, Wall Mounted Barbed
Tape, Fence Mounted Barbed Tape |
| |
|
|
| Mabry Rodgers Architects |
$302,200.00 |
First Defence Perimeter Security Fence and Gates |
| |
|
|
| Department of Corrections |
$1,324,000.00 |
Electrified Fence, Necessary Safety Controls, Graphic Control
Panels |
| |
|
|
| State of |
$76,000.00 |
Barb Tape |
| |
|
|
| Federal Correctional Institution - Admin. Maximum,
Florence, CO Blount Inc. - Construction Division |
$383,000.00 |
Maximum Security Exercise Yards, Sallyports |
| |
|
|
| 1992
Completed Project Work: |
|
|
| Altona Correctional Facility, State of |
$133,000.00 |
Barbed Tape Replacement |
| |
|
|
| Federal Corr. Inst. - Combined Facility, Pizzagalli Construction Co. |
$636,000.00 |
Security Fencing, Gate Operators, Grade Beam, Sallyports,
Segregation Yard Barbed Tape |
| |
|
|
| State of |
$164,000.00 |
Video Surveillance System, Fiber Optic Transmission
RS-232 Interface w/Computer |
| |
|
|
| State of |
$184,000.00 |
Security Fencing, Barbed Tape, Hydraulic Gate Operators,
Sallyports, Intercoms |
| |
|
|
| Perini/P.J. Dick |
$1,519,000.00 |
Security Fencing, Barbed Tape, Gate Operators, Grade
Beam, Sallyports |
| |
|
|
| Furnish
Only: |
|
|
| Chevron Overseas Petroleum |
$655,697.00 |
Furnish NonClimb 3/8" Chainguard Anti-Terrorist
Mesh ®, Installation Consultant |
| |
|
|
| 1991
Completed Project Work: |
|
|
| State of |
$86,000.00 |
Per. Electronic Security Detection System Multiplexed
Alarm Monitor System |
| |
|
|
| Anson Correctional Facility, N. C. Monroe Construction |
$524,000.00 |
Security Fencing, Sallyports, Barbed Tape |
| |
|
|
| State Correctional Institution,
|
$613,000.00 |
Security Fencing, 3/8" Mesh Fabric, Grade Beam,
Sallyports, |
| |
|
|
| Granite Construction Co. |
$2,254,000.00 |
Security Fencing, Barbed Tape, Gate Operators, Grade
Beam, Sallyports, Barrier Wall |
| |
|
|
| Gilbane/Burks/Polytech |
$734,000.00 |
Security Fencing, Barbed Tape, Gate Operators, Grade
Beam, Sallyport, Segregation Yard |
| |
|
|
| State of |
$191,000.00 |
Per. Electronic Security Detection System, Multiplexed
Alarm Monitor System |
| |
|
|
| Federal Correctional Institution, Florence, CO Southwest Construction |
$378,000.00 |
Management Contract, Materials Supplier |
| |
|
|
| State of |
$84,000.00 |
Per. Electronic Security Detection System, Multiplexed Alarm Monitor System |
| |
|
|
| 1990
Completed Project Work: |
|
|
| Northern State of |
$1,394,000.00 |
Security Fencing, Barbed Tape, Gate Operators, Grade
Beam, Sallyports |
| |
|
|
|
|
$832,500.00 |
Security Fencing, Barbed Tape, Grade Beam, Gate
Operators, Segregation Yard |
| |
|
|
| Harnett, Sampson, Franklin &
|
$718,000.00 |
Security Fencing, Barbed Tape, Grade Beam, Gate
Operators, Herbicide, Poly Aggregate |
| |
|
|
| Federal Correctional Institute, Ron Daniels |
$706,000.00 |
Security Fence, Recoating Barbed Tape, Aggregate |
| |
|
|
| Limon Correctional Facility, Limon, CO State of |
$560,000.00 |
Security Fence, Barbed Tape, Sallyports |
| |
|
|
| Federal Correctional Institute, FCI, |
$532,000.00 |
Barbed Tape Replacement |
| |
|
|
| State of |
$448,000.00 |
Security Fence, Backstops, Sallyports, Barbed Tape |
| |
|
|
| I-394 MN Dept. of Transportation |
$376,522.00 |
Highway Fence, Highway Glare Screen, 30' High Fencing,
Bridge Fencing |
| |
|
|
| MN Dept. of Administration |
$298,000.00 |
Security Fencing, Roadwork, Barbed Tape |
| |
|
|
| Seven Correctional Facilities Various Locations,
TN TN Dept. of Corrections |
$282,497.00 |
Security Fence, Grade Beam, Restore Fence, Barbed
Tape |
| |
|
|
| BE&K Construction Co. |
$233,585.00 |
Security Fence, Barbed Tape, Sallyports, Hydraulic
Gate Operator |
| |
|
|
| I-394/100, MN Dept. of Transportation |
$180,293.00 |
Highway Fence, Bridge Fencing, |
| |
|
|
| FL Dept. of Transportation |
$103,437.00 |
Glare Screen Installation |
| |
|
|
| 1989
Completed Project Work: |
|
|
| OTH-B Receive (Sectors 4,5,6), Dept. of the Army - Seattle District |
$2,043,900.00 |
Wood Fencing, Barbed Wire, |
| |
|
|
| Correctional Institution, OH Dept. of Administration |
$988,000.00 |
Security Fence, Sallyports, Barbed Tape, Grade Beam |
| |
|
|
| New Correctional Facility,
|
$560,000.00 |
Security Fence, Sallyports, Barbed Tape, Aggregate |
| |
|
|
| MI Dept. of Mgmt. & Budget |
$131,876.00 |
Replacement Fencing |
| |
|
|
| Johnson Wilson Builders |
$125,750.00 |
Specialty Fence/Gates, Animal Cages |
| |
|
|
| Federal Correctional Institution-Pleasanton, FCI-Pleasanton |
$45,624.00 |
Barbed Tape |
| |
|
|
| 1988
Completed Project Work: |
|
|
| OH Dept. of Administration |
$694,000.00 |
Security Fencing, Barbed Tape, Aggregate |
| |
|
|
| Dept. of the Army New York District |
$596,800.00 |
Fencing, Clearing/Grading, Mechanical |
| |
|
|
| Loring Air Force Base, ME Base Contracting Division |
$203,678.00 |
Security Fence Replacement & Restoration, Barbed
Wire, Site Work |
| |
|
|
| Metric Constructors |
$245,234.00 |
Security Fence, Gates |
| |
|
|
| Dan Ryan Expressway, IL Dept. of Transportation |
$203,678.00 |
Fabrication of Glare Screen Units |
| |
|
|
|
|
$107,309.00 |
Security Fencing, Gates, Clear/Grubbing |
| |
|
|
| Southern DMJM Contractors, Inc. |
$69,270.00
|
Security Fencing, Gates |
| |
|
|
| 1987
Completed Project Work: |
|
|
| State Prison of MI Dept. of Mgmt. & Budget |
$538,823.00 |
Security Fence, Sallyports, Gates |
| |
|
|
|
|
$536,400.00 |
Security Fence, Site Work, Hydraulic Lift Gates |
| |
|
|
| Interstate 75, TN Dept. of Transportation |
$446,389.00 |
Glare Screen Installation |
| |
|
|
| State of |
$368,000.00 |
Security Fence, Gates , Barbed Tape |
| |
|
|
| State of |
$362,000.00 |
Security Fencing, Gates, Grade beams, Guardrail |
| |
|
|
| K. I. Sawyer Air Force Base,
|
$345,000.00 |
Security Fence, Barbed Wire, Vertical Lift Gates |
| |
|
|
| Jackson Regional Correctional Facility, State of |
$215,800.00 |
Security Fence, Barbed Tape, Sallyports, Elect.
Slide Gates |
| |
|
|
| U. S. Army - Directorate of Contracting |
$115,900.00 |
Security Fence, Gates, Site Work |
| |
|
|
| 1986 Completed Project Work: |
|
|
| Maximum Security Prison, Deer Lodge, MT State of |
$607,000.00 |
Security Fence, Gates, Elec. Operator, Barbed Tape |
| |
|
|
| U. S. Army Engineering |
$281,700.00 |
Security Fence, Electronically Heated Guard House,
Security Lights, Remote Control Gates |
| |
|
|
| U. S. Army Tank Automotive |
$209,000.00 |
Replacement & Renovation of Perimeter. Fence,
Site Work |
| |
|
|
| Federal Prison, Federal Correctional Institution |
$196,223.00 |
Barbed Tape |
| |
|
|
| U. S. Army Contracting Division - |
$137,254.00 |
Security Fencing, Site Work |
| |
|
|
| 1985
Completed Project Work: |
|
|
|
|
$104,301.00 |
Perimeter Fence, Temporary Fence, Gates |
| |
|
|
| Minimum Security Correctional Facility,
|
$343,903.00 |
Security Fence, Grade Beam, Concrete Work |
| |
|
|
| Pilot Training Facility, Naval Air Station, Naval Air Station |
$333,745.00 |
Security Fence |
| |
|
|
| Dept. of Air Force |
$238,000.00 |
Security Fence, Site Work |
| |
|
|
| Minnesota Racetrack, Inc. |
$207,826.00 |
Perimeter Fence, Decorative Fence, Rail Fence |
| |
|
|
| Buckley Air National Guard Base, Aurora, CO Dept. of Air Force |
$157,547.00 |
Perimeter Fence, Security Cable, Site Work |
| |
|
|
| MI Dept. of Mgmt. & Budget |
$95,323.00 |
Perimeter Fence |
| |
|
|
| MI. Dept. of Mgmt. & Budget |
$81,550.00 |
Security Fence |
| |
|
|
| 1984 Completed Project Work: |
|
|
| Airport, City of |
$255,922.00 |
Security Fence, Site Work |
| |
|
|
| Baker/Able Sites, Nuclear Test Monitoring Facility Mercury, NV Department of Energy |