Project |
Contract Amount |
Type of Work Performed |
| 2007 Work in Progress: | ||
|
State of Maryland
|
1,961,841.35 | Furnish and install double perimeter security fencing |
|
US Army Corps of Engineers Lock and Dam Security Systems |
$1,778,388.57 | Electronic Entry Control Systems include proximity-card/keypad entry control with balanced magnetic switch intrusion detection (IDS) on select Central Control Station (CCS) exterior end interior doors and downstream control stand (DCS) doors, DCS control panel lockouts, and modifications to the existing access control system at the perimeter gates, at each dam site. Includes all necessary conduit, wiring and fiver optics. Contractor's staff working on sites must pass both local and national background checks. |
|
Southeast Missouri Mental Health Center, Farmington, MO Modification to Fencing |
$219,000 |
Modification to perimeter fence |
|
2006 Work Completed: |
|
|
|
City of Philadelphia, PA Perimeter Security Improvements |
$1,745,000.00 |
Furnish and Install First Defense with High Security Mesh, stone treatment, demolish existing fence, electrical conduit and wiring, taut wire outrigger and central control |
|
Tennessee Depart of Correction
|
$2,295,000.00 |
Conduit, Wiring, CCTV, DVR’s, Intercom, Door Locking, Panic Buttons |
|
State of Minnesota, MN Dept. of Human Services
|
$367,000 | Security upgrades to perimeter fence & modification to roof & fence, Prime contractor Morcon |
|
State of Minnesota, Dept. of Corrections, Fairbault, MN
|
$313,000 |
Construct new Sally port Tymetal gates and operator |
|
State Correctional Institution Mercer, Findley Township, PA
|
$1,660,000.00 | Replace Double Perimeter Fence at operating institution, high security mesh fence, barb tape, Overhead Slide Gates with crash beam, remove old fence |
|
Duluth air National Guard, Duluth, MN
|
$98,000 | Security upgrade to(WSA)-Weapons storage area-vertical pivot gate & fence |
|
State Of Wisconsin, Ashland Co. Hwy Department, Madison, WI Airport Security Improvements |
$340,000 |
Woven wire fence-28,000 LF, Cantilever motorized gates, architectural fence and gates-2000 LF |
|
|
|
|
|
City of Fridley, Anoka County, MN
|
$319,000 |
Ornamental Fence & Decorative Brick Pillars |
|
|
|
|
|
State of Missouri, Missouri Eastern Correctional Center, Pacific, MO
|
$124,500 |
Replace two PLUSS Gates & Operator |
|
|
|
|
|
State of Minnesota St. Peter Regional Treatment Center, St. Peter, MN
|
$494,000 | Perimeter Fence & Barb Tape |
|
Anoka County Airport, Metropolitan Airport Commission, Blaine, MN
|
$111,000 |
Perimeter Security Upgrade 6000 L.F. of 10’ fence & gates Prime contractor NW Asphalt |
|
2005 Work Completed: |
|
|
|
Tennessee Depart of Correction |
$3,515,000.00 |
Conduit, Wiring, CCTV, DVR’s, Intercom, Door Locking, Perimeter Taut Wire Intrusion with Head End Equipment |
|
State Correctional Institution Camp Hill, Camp Hill, PA Department of General Services |
$1,900,000.00 | Replace Double Perimeter Fence at operating institution, high security mesh fence, barb tape, Overhead Slide Gates with crash beam, hollow metal doors in existing building |
|
Southeastern Correctional Institution Perimeter Security Upgrade |
$1,610,000.00 | Demolishing of existing of existing buildings and existing fence; Replace Double Perimeter Fence and barb tape at operating institution; Electrical Perimeter Security Upgrade, including conduit and wiring, Fence Micronet Shaker System, fiber optics, CCTV and central control |
|
Forrester Construction Company, Inc Norfolk Naval Air Station |
$1,350,000.00 | Furnish and Install Active Barriers, Crash Beams, Crash Gates, Ornamental Passive Barrier, Ornamental Fence, Permanent Bollards, Retractable Bollards, Turnstiles, Chain Link, Fence, Crash Resistant Cable Barrier, electrical controls and control panels |
|
|
|
|
|
2004 Work Completed: |
|
|
|
ASPC - Florence-Central Unit State of Arizona |
$1,208,000.00 |
Furnish and Install Stun Lethal Fence CCTV with Fiber Optics; complete PLC system controls, HM Doors, Generator, miscellaneous Chain Link fence work |
|
|
|
|
|
State Correctional Institution Luzerne Cty, Dallas, PA Department of General Services |
$1,379,000.00 |
Electrical Perimeter Security, including PPI Fence Shaker System, Microwave, fiber optics and CCTV |
|
|
|
|
|
Jefferson Correctional Center JE Dunn Construction Company |
$1,500,000.00 |
Electrified Lethal Fence, Necessary PLC Controls &, Software, Concrete Grade Beams, Specialize Gates, All Related, Electrical Work |
|
|
|
|
|
2003 Work Completed: |
|
|
|
Hudson County Correctional Center Marsellis-Warner Corporation |
$550,000.00 |
Security Fencing and Overhead Slide Gates, Electrically Operated |
|
|
|
|
|
Duluth Air National Guard Max Gray Construction, Inc. |
$138,482.00 |
Remove and Install Chain Link Fence, Crash Resistant Cable Barrier |
|
|
|
|
|
Mankato Regional Airport WSB & Associates |
$224,719.97 |
Perimeter Fence |
|
|
|
|
|
2002 Work Completed: |
|
|
|
Minnesota Correctional Facility-Faribault KBA Durrant |
$391,600.00 |
Remote Locking, Doors and Frames, CCTV and Key Switch Locks |
|
|
|
|
|
Collins Correctional Facility OGS Design & Construction-Div. Of Const. |
$349,500.00 |
Upgrade Pedestrian Gate and Gate Consoles, Electrical upgrade |
|
|
|
|
|
Potosi Correctional Center, Mineral Point, MO KBA Durrant |
$344,000.00 |
Security Fencing, Guard Tower, Sally Port Upgrade, Overhead Slide Gates |
|
|
|
|
|
Taft Youth Development Center Pikeville, TN J. Mark Rogers Architect |
$430,000.00 |
Security Fencing, First Defence System, Overhead Slide Gates |
|
|
|
|
|
Brunswick Correctional Center Architectural & Engineering Services |
NA |
NON LETHAL FENCE, complete operational and functional, test in real time environment for proprietary, electric stun fence. Installed summer of 2000, running successfully since |
|
|
|
|
|
Shawangunk Correctional Facility Wallkill, New York O.G.S. Design & Construction - Division of Construction |
$330,000.00 |
Security Fencing, Sally Port Upgrade, Overhead Slide Gates |
|
|
|
|
|
2001 Work Completed: |
|
|
|
Victor Cullen Center Frederick County, MD Maryland Department of General Services |
$328,000.00 |
Chain link fencing and gates, Electrically operated gates, CCTV |
|
|
|
|
|
State Correctional Institution, Greene County, Waynesburg, PA Department of General Services - |
$268,000.00 |
New fence and gates, Electric Locks, Intercom, CCTV |
|
|
|
|
|
Minnesota Correctional Facility Clinic Infirmary & Mental Health Unit Frerichs Construction Company |
$49,605.00 |
Chain link fence, barb tape, and overhead slide gate |
|
|
|
|
|
Minnesota Correctional Facility-Stillwater State of Minnesota |
$38,900.00 |
New perimeter razor wire |
|
|
|
|
|
Wisconsin National Guard Armory State of Wisconsin |
$219,000.00 |
Electrical, intercom, chain link, wrought iron, electrical gates |
|
|
|
|
|
East Jersey Correctional Facility Ray Angelini, Inc. |
$495,000.00 |
Perimeter security fence, barb tape, electrical gate operators |
|
|
|
|
|
Prairie du Chien Correctional Institution PTD, Inc. |
$39,000.00 |
Security Screens |
|
|
|
|
|
South East Correctional Center Consolidate Electrical Contractors & Engineers. |
$363,000.00 |
Provide Electrified Lethal Fence Electrifiers, Control Panels and Wire Array Equipment and Supervision |
|
|
|
|
|
Eastern Recption, Diagnostic & Correctional Center Bonne Terre, MO Bell Electrical Contractors |
$325,000.00 |
Provide Electrified Lethal Fence Electrifiers, Control Panels and Electrified Fence Post and Wire Array Equipment and Supervision |
|
|
|
|
2000 Completed Project Work: |
|
|
|
Northeast Correctional Center, Bowling Green, MO George Butler and Associates |
$2,740,000.00 |
Electrified Lethal Fence, Necessary Controls & Software, Concrete Paving & Grade Beams Electrical and Misc. Guard Tower Construction |
|
|
|
|
|
Six (6) Michigan Correctional Facilities, Michigan Department of Management and Budget |
Bid Pack #A - $377,000.00
Bid Pack #B - $349,000.00 |
Perimeter Security Upgrades, Buried Chain Link Fabric, Electrified Security |
|
|
|
|
|
Repairs & Upgrade of Secure Perimeter Fence Kearny, NJ Mr. David Markunius |
$653,000.00 |
Barb Tape, Upgrade Barb Tape, New OH Slide, Electric Gates, Concrete Grade Beam, Operator, Controls, SW Microwave Shaker and Electrical |
|
|
|
|
|
MN Correctional Facility- Stillwater Gate Repair Stillwater, MN |
$253,000.00 |
New Sallyport, PLUSS Gate Systems, Concrete work, Sewer and Water |
|
|
|
|
|
Red Wing Correctional Facility, Red Wing, MN Klein McCarthy & Co., Ltd. |
$1,066,000.00 |
First Defence, Site Work, Parking Lots, Gate Operators |
|
|
|
|
|
Provide Perimeter Fence System, Tryon, NY State of New York |
$1,465,000.00 |
Security Fence, Gate Operators, Sallyports, Barbed Tape, Electrical, Various Civil Work |
|
|
|
|
|
1999 Completed Project Work: |
|
|
|
Wisconsin Supermax, Boscobel, WI Kraemer Brothers |
$815,000.00 |
Stun-Lethal Fence, Necessary Controls & Software, Electrical, and Misc. Site Work |
|
|
|
|
|
South Central Correctional Center Licking, MO Guarantee Electrical |
$132,965.00 |
Install Electrified Fence Array, Provide and Install |
|
|
|
|
|
Potosi Correctional Center, Mineral Point, MO and Fulton Reception and Diagnostic Center, Fulton, MO George Butler and Associates |
$3,519,000.00 |
Electrified Lethal Fence, necessary Controls & Software, Concrete Paving & Grade Beams, Electrical and Misc., Site Work & Fence Array |
|
|
|
|
|
1998 Completed Project Work: |
|
|
|
Replace Concertina Wire at Seven (7) Michigan Correctional Facilities, Michigan Department of Management and Budget |
Bid Pack #1 - $487,000.00
Bid Pack #2 - $737,000.00 |
Replace Barb Tape |
|
|
|
|
|
Perimeter Fence and Sallyport, Delaware County Prison Bedwell Company |
$690,000.00 |
First Defence Arched Security Fence, Gate Operators, Sallyports |
|
|
|
|
|
New Maximum Security Facility, Shirley, MA Turner Construction Company |
$1,550,000.00 |
Perimeter Fence, High Security Mesh Specialized Rec. Cages, Sallyport & Operators, Barb Tape |
|
|
|
|
|
Perimeter Fence System, Lebanon, OH Department of Rehabilitation & Correction |
$1,420,000.00 |
Security Fence, Gate Operators, Sallyports, Barbed, Tape, Electrical, FPS-3 Fence Protection, System, Microwave |
|
|
|
|
|
Prison for Drug Offenders, Chester, PA Brown & Root Building Company |
$858,000.00 |
Security Fence, Gate Operators, Sallyports, Barbed Tape, Electrical, |
|
|
|
|
|
1997 Completed Project Work: |
|
|
|
State Correctional Institution, SCI Laurel Highlands Department of General Services |
$719,000.00 |
Perimeter Fence, Barb Tape, Concrete Sidewalk and Curb, Sallyports |
|
|
|
|
|
London Correctional Institute, London, OH Sherman R. Smoot |
$717,000.00 |
Security Fence, Gate Operators, Sallyports, Barbed Tape |
|
|
|
|
|
Western Correctional Facility, Cumberland, MD, Stage III Chas. H. Tompkins Co. |
$2,601,000.00 |
Security Fence, Gate Operators, Sallyports, Barbed Tape, Electrical |
|
|
|
|
|
Western Correctional Facility, Cumberland, MD, Stage II Bell BCI Company |
$1,611,000.00 |
Security Fence, Gate Operators, Sallyports, Barbed Tape, Electrical |
|
|
|
|
|
1996 Completed Project Work: |
|
|
|
MN Department of Corrections, St. Cloud, MN, North Courtyard St. Cloud Correctional |
$158,000.00 |
Specialized Rec. Cages |
|
|
|
|
|
Cybulski Correctional Institution, Project No. BI-DC-76 Department of Corrections |
$248,000.00 |
Security Fence, Blacktop, Sallyports, Barbed Tape |
|
|
|
|
|
Willard Correctional Institution, Project No. BI-DC-77 Department of Corrections |
$244,000.00 |
Security Fence, Blacktop, Sallyports, Barbed Tape |
|
|
|
|
|
Maryville Treatment Center Project No. 30-931-95-0020(B) Loch Sand and Construction |
$429,000.00 |
Security Fence, First Defence, Sallyports, Barbed Tape, Operators |
|
|
|
|
|
1995 Completed Project Work: |
|
|
|
Barksdale Air Force Base WSA, Shreveport, LA Department of the Navy - ROICC |
$468,000.00 |
Remove & Replace Perimeter Fence, Roadwork |
|
|
|
|
|
Minnesota Correctional Facility, Moose Lake, MN Stahl Construction Company |
$553,890.00 |
Security Fence, Gate Operators, Sallyports, Barbed Tape |
|
|
|
|
|
Minnesota Correctional Facility, Lino Lakes, MN State of Minnesota |
$777,000.00 |
Security Fence, Barb Tape, CCTV, FPS Electronic Fence Protection System, 50’ Camera Poles |
|
|
|
|
|
1994 Completed Project Work: |
|
|
|
Adirondack Correctional Facility, Raybrook, NY State of New York - Dept. of General Services |
$213,000.00 |
Remove & Replace Barbed Tape |
|
|
|
|
|
Garner Correctional Institution, Newtown, CT Connecticut Dept. of Corrections |
$310,000.00 |
Security Fence, Gate Operators, Sallyports, Barbed Tape, Roof Mounted Barbed Tape |
|
|
|
|
|
Muhlenberg County Security Prison, Central City, KY Commonwealth of Kentucky |
$548,000.00 |
Security Fence, Gates |
|
|
|
|
|
Somers Correctional Institution, Sommers, CT Orlando, Annulli & Sons, Inc. |
$689,000.00 |
Security Fence, Gate Operators, Sallyports, Barbed Tape, Taut Wire System |
|
|
|
|
|
Draper State Prison, Draper, UT State of Utah - Division of Facilities Construction & Management |
$1,310,000.00 |
Electronic Security, Security Fencing |
|
|
|
|
|
Furnish Only: |
|
|
|
Nigeria Chevron Overseas Petroleum |
$655,697.00 |
Furnish NonClimb3/8" Chainguard Anti-Terrorist Mesh ® |
|
|
|
|
|
1993 Completed Project Work: |
|
|
|
Marquette County Airport, Marquette, MI State of Michigan - Department of Transportation |
$523,244.00 |
Perimeter Fence, Clearing, Seeding |
|
|
|
|
|
A.A. Ribicoff Courthouse Annex, Hartford, CT General Services Administration |
$121,672.00 |
Wrought Iron Fence, Electric Operated Gates. |
|
|
|
|
|
Colorado State Penitentiary, East Canon City, CO CRSS |
$255,725.00 |
Security Fence, Barbed Tape, Electrically Operated Gates |
|
|
|
|
|
Old Colony Correctional Center, Bridgewater, MA Commonwealth of Massachusetts |
$157,500.00 |
Wall Mounted Security Fence, Wall Mounted Barbed Tape, Fence Mounted Barbed Tape |
|
|
|
|
|
Mountain View Youth Dev. Center, Dandridge, TN Mabry Rodgers Architects |
$302,200.00 |
First Defence Perimeter Security Fence and Gates |
|
|
|
|
|
California State Prison Calipatria Department of Corrections |
$1,324,000.00 |
Electrified Fence, Necessary Safety Controls, Graphic Control Panels |
|
|
|
|
|
Bridgeport Community Correctional Center State of Connecticut |
$76,000.00 |
Barb Tape |
|
|
|
|
|
Federal Correctional Institution - Admin. Maximum, Florence, CO Blount Inc. - Construction Division |
$383,000.00 |
Maximum Security Exercise Yards, Sallyports |
|
|
|
|
|
1992 Completed Project Work: |
|
|
|
Altona Correctional Facility, Altona, NY State of New York |
$133,000.00 |
Barbed Tape Replacement |
|
|
|
|
|
Federal Corr. Inst. - Combined Facility, Allenwood, PA Pizzagalli Construction Co. |
$636,000.00 |
Security Fencing, Gate Operators, Grade Beam, Sallyports, Segregation Yard Barbed Tape |
|
|
|
|
|
California Ventura School, Camarillo, CA State of California |
$164,000.00 |
Video Surveillance System, Fiber Optic Transmission RS-232 Interface w/Computer |
|
|
|
|
|
Bridgeport Community Correctional Center State of Connecticut |
$184,000.00 |
Security Fencing, Barbed Tape, Hydraulic Gate Operators, Sallyports, Intercoms |
|
|
|
|
|
Somerset County Correctional Facility, Somerset, PA Perini/P.J. Dick |
$1,519,000.00 |
Security Fencing, Barbed Tape, Gate Operators, Grade Beam, Sallyports |
|
|
|
|
|
Furnish Only: |
|
|
|
Chevron Overseas Petroleum |
$655,697.00 |
Furnish NonClimb 3/8" Chainguard Anti-Terrorist Mesh ®, Installation Consultant |
|
|
|
|
|
1991 Completed Project Work: |
|
|
|
Rockville Training Center, Rockville, IN State of Indiana - Dept. of Corrections |
$86,000.00 |
Per. Electronic Security Detection System Multiplexed Alarm Monitor System |
|
|
|
|
|
Anson Correctional Facility, Polkton, NC N. C. Monroe Construction |
$524,000.00 |
Security Fencing, Sallyports, Barbed Tape |
|
|
|
|
|
State Correctional Institution, Cambridge Springs, PA Commonwealth of PA - Dept. of General Services |
$613,000.00 |
Security Fencing, 3/8" Mesh Fabric, Grade Beam, Sallyports, Perimeter Road, Vinyl Fabric |
|
|
|
|
|
California State Prison, Lancaster, CA Granite Construction Co. |
$2,254,000.00 |
Security Fencing, Barbed Tape, Gate Operators, Grade Beam, Sallyports, Barrier Wall |
|
|
|
|
|
Trumbull Correctional Institution, Warren, OH Gilbane/Burks/Polytech |
$734,000.00 |
Security Fencing, Barbed Tape, Gate Operators, Grade Beam, Sallyport, Segregation Yard |
|
|
|
|
|
Preston School of Industry, Ione, CA State of California - Dept. of Youth Authority |
$191,000.00 |
Per. Electronic Security Detection System, Multiplexed Alarm Monitor System |
|
|
|
|
|
Federal Correctional Institution, Florence, CO Southwest Construction |
$378,000.00 |
Management Contract, Materials Supplier |
|
|
|
|
|
Ventura School, Camarillo, CA State of California - Dept. of Youth Authority |
$84,000.00 |
Per. Electronic Security Detection System, Multiplexed Alarm Monitor System |
|
|
|
|
|
1990 Completed Project Work: |
|
|
|
Northern California Youth Center, Stockton, CA State of California |
$1,394,000.00 |
Security Fencing, Barbed Tape, Gate Operators, Grade Beam, Sallyports |
|
|
|
|
|
West Tennessee Multi-Purpose Prison, Lauderdale City, TN Tennessee. Department of Corrections |
$832,500.00 |
Security Fencing, Barbed Tape, Grade Beam, Gate Operators, Segregation Yard |
|
|
|
|
|
Harnett, Sampson, Franklin & Johnston Corr. Fac., NC North Carolina Office of State Management & Budget |
$718,000.00 |
Security Fencing, Barbed Tape, Grade Beam, Gate Operators, Herbicide, Poly Aggregate |
|
|
|
|
|
Federal Correctional Institute, Butner, NC Ron Daniels |
$706,000.00 |
Security Fence, Recoating Barbed Tape, Aggregate |
|
|
|
|
|
Limon Correctional Facility, Limon, CO State of Colorado - Dept. of Corrections |
$560,000.00 |
Security Fence, Barbed Tape, Sallyports |
|
|
|
|
|
Federal Correctional Institute, Otisville, NY FCI, Otisville, NY |
$532,000.00 |
Barbed Tape Replacement |
|
|
|
|
|
St. Louis Correctional Facility, St Louis, MI State of Michigan Dept. of Corrections |
$448,000.00 |
Security Fence, Backstops, Sallyports, Barbed Tape |
|
|
|
|
|
I-394 Hennepin County, MN MN Dept. of Transportation |
$376,522.00 |
Highway Fence, Highway Glare Screen, 30' High Fencing, Bridge Fencing |
|
|
|
|
|
Minnesota Correctional Facility, Faribault, MN MN Dept. of Administration |
$298,000.00 |
Security Fencing, Roadwork, Barbed Tape |
|
|
|
|
|
Seven Correctional Facilities Various Locations, TN TN Dept. of Corrections |
$282,497.00 |
Security Fence, Grade Beam, Restore Fence, Barbed Tape |
|
|
|
|
|
Boise Cascade Paper Mill, International Falls, MN BE&K Construction Co. |
$233,585.00 |
Security Fence, Barbed Tape, Sallyports, Hydraulic Gate Operator |
|
|
|
|
|
I-394/100, Hennepin County, MN MN Dept. of Transportation |
$180,293.00 |
Highway Fence, Bridge Fencing, Pedestrian Bridge Fence |
|
|
|
|
|
Florida Dept. of Transportation, Jacksonville, FL FL Dept. of Transportation |
$103,437.00 |
Glare Screen Installation |
|
|
|
|
|
1989 Completed Project Work: |
|
|
|
OTH-B Receive (Sectors 4,5,6), Rim Rock Lake, Tule Lake, CA Dept. of the Army - Seattle District |
$2,043,900.00 |
Wood Fencing, Barbed Wire, Perimeter Road Installation |
|
|
|
|
|
Correctional Institution, Mansfield, OH OH Dept. of Administration |
$988,000.00 |
Security Fence, Sallyports, Barbed Tape, Grade Beam |
|
|
|
|
|
New Correctional Facility, West Liberty, KY Commonwealth of Kentucky |
$560,000.00 |
Security Fence, Sallyports, Barbed Tape, Aggregate |
|
|
|
|
|
Regional Detention Center, Flint, MI MI Dept. of Mgmt. & Budget |
$131,876.00 |
Replacement Fencing |
|
|
|
|
|
Lake Superior Zoological Gardens, Duluth Zoo, Duluth, MN Johnson Wilson Builders |
$125,750.00 |
Specialty Fence/Gates, Animal Cages |
|
|
|
|
|
Federal Correctional Institution-Pleasanton, Dublin, CA FCI-Pleasanton |
$45,624.00 |
Barbed Tape |
|
|
|
|
|
1988 Completed Project Work: |
|
|
|
Warren Correctional Facility, Lebanon, OH OH Dept. of Administration |
$694,000.00 |
Security Fencing, Barbed Tape, Aggregate |
|
|
|
|
|
Plattsburgh Air Force Base, Plattsburgh, NY Dept. of the Army New York District |
$596,800.00 |
Fencing, Clearing/Grading, Mechanical |
|
|
|
|
|
Loring Air Force Base, ME Base Contracting Division |
$203,678.00 |
Security Fence Replacement & Restoration, Barbed Wire, Site Work |
|
|
|
|
|
Toyota Automotive Mfg. Facility, Georgetown, KY Metric Constructors |
$245,234.00 |
Security Fence, Gates |
|
|
|
|
|
Dan Ryan Expressway, Chicago, IL IL Dept. of Transportation |
$203,678.00 |
Fabrication of Glare Screen Units |
|
|
|
|
|
Anoka County Blaine Airport, Blaine, MN Metropolitan Airport Commission |
$107,309.00 |
Security Fencing, Gates, Clear/Grubbing |
|
|
|
|
|
Southern Desert Indian Springs, NV DMJM Contractors, Inc. |
$69,270.00 |
Security Fencing, Gates |
|
|
|
|
|
1987 Completed Project Work: |
|
|
|
State Prison of South Michigan, Jackson, MI MI Dept. of Mgmt. & Budget |
$538,823.00 |
Security Fence, Sallyports, Gates |
|
|
|
|
|
Fort Ritchie Army Base, Waynesboro, PA U. S. Army Corps of Engineers - Baltimore District |
$536,400.00 |
Security Fence, Site Work, Hydraulic Lift Gates |
|
|
|
|
|
Interstate 75, Knoxville, TN TN Dept. of Transportation |
$446,389.00 |
Glare Screen Installation |
|
|
|
|
|
Ionia Maximum Security Prison, Ionia, MI State of Michigan |
$368,000.00 |
Security Fence, Gates , Barbed Tape |
|
|
|
|
|
Diagnostic & Reception Center, Fulton, MO State of Missouri - Jefferson City, MO |
$362,000.00 |
Security Fencing, Gates, Grade beams, Guardrail |
|
|
|
|
|
K. I. Sawyer Air Force Base, Gwinn, MI U. S. Army Corps of Engineers, Omaha, NE |
$345,000.00 |
Security Fence, Barbed Wire, Vertical Lift Gates |
|
|
|
|
|
Jackson Regional Correctional Facility, Jackson, MI State of Michigan |
$215,800.00 |
Security Fence, Barbed Tape, Sallyports, Elect. Slide Gates |
|
|
|
|
|
Fort Riley Army Base, Manhattan, KS U. S. Army - Directorate of Contracting |
$115,900.00 |
Security Fence, Gates, Site Work |
|
|
|
|
|
1986 Completed Project Work: |
|
|
|
Maximum Security Prison, Deer Lodge, MT State of Montana - Helena, MT |
$607,000.00 |
Security Fence, Gates, Elec. Operator, Barbed Tape |
|
|
|
|
|
Detroit Arsenal, Warren, MI U. S. Army Engineering |
$281,700.00 |
Security Fence, Electronically Heated Guard House, Security Lights, Remote Control Gates |
|
|
|
|
|
Detroit Arsenal, Warren, MI U. S. Army Tank Automotive |
$209,000.00 |
Replacement & Renovation of Perimeter. Fence, Site Work |
|
|
|
|
|
Federal Prison, Pleasanton, CA Federal Correctional Institution |
$196,223.00 |
Barbed Tape |
|
|
|
|
|
USAR Center Complex, Milwaukee, WI U. S. Army Contracting Division - Sparta, WI |
$137,254.00 |
Security Fencing, Site Work |
|
|
|
|
|
1985 Completed Project Work: |
|
|
|
Lake Superior Paper Industries, Duluth, MN Lake Superior Paper Ind. |
$104,301.00 |
Perimeter Fence, Temporary Fence, Gates |
|
|
|
|
|
Minimum Security Correctional Facility, Springfield, SD South Dakota. Dept. of Transportation |
$343,903.00 |
Security Fence, Grade Beam, Concrete Work |
|
|
|
|
|
Pilot Training Facility, Naval Air Station, Fallon, NV Naval Air Station |
$333,745.00 |
Security Fence |
|
|
|
|
|
Cape Canaveral AFS Ind. Area & FSA #2, Rocket Storage Facility, FL Dept. of Air Force |
$238,000.00 |
Security Fence, Site Work |
|
|
|
|
|
Canterbury Downs Racetrack, Shakopee, MN Minnesota Racetrack, Inc. |
$207,826.00 |
Perimeter Fence, Decorative Fence, Rail Fence |
|
|
|
|
|
Buckley Air National Guard Base, Aurora, CO Dept. of Air Force |
$157,547.00 |
Perimeter Fence, Security Cable, Site Work |
|
|
|
|
|
Regional Psychiatric Hospital, Northville, MI MI Dept. of Mgmt. & Budget |
$95,323.00 |
Perimeter Fence |
|
|
|
|
|
Branch County Public Works Unit, Coldwater, MI MI. Dept. of Mgmt. & Budget |
$81,550.00 |
Security Fence |
|
|
|
|
|
1984 Completed Project Work: |
|
|
|
Airport, Des Moines, IA City of Des Moines |
$255,922.00 |
Security Fence, Site Work |
|
|
|
|
|
Baker/Able Sites, Nuclear Test Monitoring Facility Mercury, NV Department of Energy |
$127,895.00 |
Security Fence |
|
|
|
|
|
1983 Completed Project Work: |
|
|
|
Medium Security Northpoint Training Ctr., Burgin, KY State of Kentucky |
$408,000.00 |
Security Fence, Elect. Operated Overhead Gates, Barbed Tape |
|
|
|
|
|
Fort Carson, Colorado Springs, CO U. S. Army Corps of Eng. |
$224,500.00 |
Guardrails |
|
|
|
|
|
Military Reservation, Sparta, WI U. S. Army Ft. McCoy |
$160,625.00 |
Security Fence |
|
|
|
|
|
Mississippi River, Lock & Date #1, St. Paul, MN U. S. Corps of Engineers |
$98,000.00 |
Security Fence, Aluminum Handrail |
|
|
|
|
|
Fort Carson, Colorado Springs, CO U. S. Army - Fort Carson |
$69,150.00 |
Traffic Signs |
|
|
|
|
|
Mendota Mental Health Facilities, Madison, WI State of Wisconsin |
$62,000.00 |
Security Fence |
|
|
|
|
|
1982 Completed Project Work: |
|
|
|
Dept. of Energy Uranium Processing Facility, Golden, CO Dept. of Energy Sheehy Construction |
$675,000.00 |
Special Purpose Structural Gates, Security Fence |
|
|
|
|
|
Maximum Security Prison, Oak Park Heights, MN MN Dept. of Administration |
$370,000.00 |
Security Fence, Barbed Tape , Elect. Oper Overhead Gates |
|
|
|
|
|
Strategic Air Command, Wurtsmith AFB, Oscoda, MI U. S. Corps of Engineers Omaha District Blount Brothers Corp. |
$60,000.00 |
Security Fence |
|
|
|
|
|
1981 Completed Project Work: |
|
|
|
Dept. of Army Ammunition Storage Facility, Newport, IN U. S. Corps of Engineers - Indiana Area Elton A. Wagner Company |
$120,000.00 |
Security Fence |
|
|
|
|
|
1980 Completed Project Work: |
|
|
|
Como Zoo, St. Paul, MN City of St. Paul |
152,000.00 |
Custom Cage Enclosures, Remote Oper. Gates |
|
|
|
|
|
1979 Completed Project Work: |
|
|
|
Wood Screen Walls, Minnesota Dept. of Transportation |
$289,650.00 |
Wood Screen Wall, Site Work |
|
|
|
|
|
Strategic Air Command, Minot AFB, Minot, ND U. S. Corps of Engineers - Minot Air Force Base G & S Construction Co. |
$190,000.00 |
Security Fence, Elect. Operated Overhead Gates, Barbed Tape |
|
|
|
|
|
General Mitchell Field, Milwaukee, WI Milwaukee County Airport |
$140,000.00 |
Restoration of Fence, Elect. Operated Gates |
|
|
|
|
|
Highway Fencing, St. Cloud, MN MN Dept. of Transportation |
$124,500.00 |
Deer Fence Enclosure |
|
|
|
|
|
1978 Completed Project Work: |
|
|
|
Dept. of Army Hazardous Gas Storage Fac., Pueblo, CO U. S. Corp. of Engineers - Rocky Mountain Region R. W. Contracting |
$265,000.00 |
Double Line, Security Fence, Barbed Tape
|
|
|
|
|
|
1977 Completed Project Work: |
|
|
|
Highway Fencing, Kansas City, MO Missouri Dept of Transportation |
$87,000.00 |
Highway Fence |
|
|
|
|
|
1975-1976 Completed Project Work: |
||
|
Minnesota Zoological Gardens, Apple Valley, MN State of Minnesota |
$310,000.00 |
Cages, Gate Controls |
|
|
||